11-27 Doriemus Drive

Truganina, VIC

Australia

Introduction

Visy Construction at West Park Industrial Estate

Visy Construction, a global leader in packaging and resource recovery, have committed to a 20-year lease term. Their facility comprises of a 42,189 sqm warehouse, 1,025 sqm office and 113 car park spaces.

Property snapshot

Property size

Site 78,843 sqm

Warehouse size 42,189 sqm

Office size 1,025 sqm

Car park spaces 113

Completed

September 2018

2km

to the Deer Park Bypass (M8)

9km

to the Princes Freeway (M1)

23km 

to Melbourne CBD

8 recessed

 loading docks

4 at-grade

roller shutter doors

80

car park spaces

5 Star

Green Star Design certified rating

Water saving

tapware

Rainwater

capture and re-use

Location

West Park Industrial Estate delivers fast, direct and unbeatable access in all directions. Our 310 Ha estate is located within 19km of the Melbourne CBD with a choice of routes to the Deer Park Bypass, Western Ring Road, Tullamarine Freeway and Princes Freeway. Entry and exit points to the estate is via four signalised intersections.

Strategic access
Airport
Sport + health
Eat + drink
Transport
Open in Google Maps

Features

 

 

Alt Text

Sustainability

 

 

News

16.12.24

Frasers Property Industrial appoints Elaine Ong as Chief Financial Officer

We are pleased to announce the appointment of Elaine Ong as our new Chief Financial Officer (CFO).

04.12.24

ARDEX Australia opens Headquarters at The YARDS

We are extremely proud to announce the opening of  ARDEX Australia’s Oceania Headquarters at The YARDS, Kemps Creek, NSW. 

27.11.24

CIP Constructions appointed to build IVE Group facility in Melbourne

Construction is set to commence soon for our long-standing customer, IVE Group, with CIP Constructions appointed as the builder for this built-to-suit facility at our 41 ha Rubix Connect estate in Melbourne’s south east.

24.11.24

Two new leasing deals secured with Fletcher Insulation

We’re thrilled to announce that Fletcher Insulation has signed two new leases with us in Victoria, marking our third transaction with the group since 2020.

18.11.24

Solar power installation begins at The Tube, Germany

Together with Sunrock, we are excited to announce the installation of a 6.7 MWp solar power system at The Tube in Düsseldorf, Germany.

Contact

Get in touch

Follow us

Stay informed on our social media channels

Recommended

The Tube

New development

Canvas West

Sustainability

Sustainability

Our Vision