CTI Logistics & GMK Logistics

25 Oldham Road
Epping, VIC
Australia

 

Introduction

GMK Logistics at 4Ten Epping

Our longstanding customer GMK Logistics, a subsidiary of CTI Logistics has moved into their new cutting-edge facility at our Premium Estate 4Ten Epping in Melbourne’s north, committing to a 10-year lease term. The leading Australian flooring logistics supplier will benefit from an expansive 25,988 sqm of warehouse space complemented by two mezzanine offices totalling 1,640 sqm, full drive around access via dual hardstands, 16 recessed loading docks and 9 at-grade roller shutter doors which will support the company in storing and distributing their flooring products.

Property snapshot

Property size

Site 47,335 sqm 

Warehouse size 25,988 sqm

Office A size 908 sqm

Office B size 732 sqm

Car park spaces 152

 

Practical completion

March 2024

250m 

Hume Freeway access

32km 

to Melbourne CBD

20km 

Melbourne Airport

16 recessed

 loading docks

9 at-grade 

roller shutter doors

152

car park spaces

5 Star

5 Star Green Star Design rating (targeting)

Water saving

tapware (minimum 5 WELS rating)

Rainwater

capture and re-use

Location

Positioned to perform

Connectivity is key. 4Ten Epping's location delivers fast, direct and unbeatable access in all directions.

Strategic access
Airport
Sport + health
Eat + drink
Transport
Open in Google Maps
frasers
frasers

Features

 

 

Alt Text

Sustainability

 

 

  • Targeting 5 Star Green Star Design & As-Built v1.3 rating from the Green Building Council of Australia
  • Rainwater capture and re-use
  • Energy efficient sensor lighting to office and warehouse areas
  • Water saving tapware (min 5 WELS rating)
frasers

Learn more about 4Ten Epping

News

16.12.24

Frasers Property Industrial appoints Elaine Ong as Chief Financial Officer

We are pleased to announce the appointment of Elaine Ong as our new Chief Financial Officer (CFO).

04.12.24

ARDEX Australia opens Headquarters at The YARDS

We are extremely proud to announce the opening of  ARDEX Australia’s Oceania Headquarters at The YARDS, Kemps Creek, NSW. 

27.11.24

CIP Constructions appointed to build IVE Group facility in Melbourne

Construction is set to commence soon for our long-standing customer, IVE Group, with CIP Constructions appointed as the builder for this built-to-suit facility at our 41 ha Rubix Connect estate in Melbourne’s south east.

24.11.24

Two new leasing deals secured with Fletcher Insulation

We’re thrilled to announce that Fletcher Insulation has signed two new leases with us in Victoria, marking our third transaction with the group since 2020.

18.11.24

Solar power installation begins at The Tube, Germany

Together with Sunrock, we are excited to announce the installation of a 6.7 MWp solar power system at The Tube in Düsseldorf, Germany.

Contact

Get in touch

Matt Gillett

Matt Gillett

General Manager - Business Development 

Frasers Property Industrial

 

matt.gillett@frasersproperty.com.au

Office +61 3 9426 1057

Mobile +61 418 523 930

Dom Meese

Dom Meese

Development Manager

Frasers Property Industrial

 

dom.meese@frasersproperty.com.au

Office +61 3 9426 1036

Mobile +61 419 012 641

Follow us

Stay informed on our social media channels

Recommended

frasers

New development

4Ten Epping

The Tube

Download the app

Healthy Heads in
Trucks & Sheds