30 Oldham Road

Epping VIC

Australia

Introduction

Mazda Australia at 4Ten Epping

This cutting-edge facility at 4Ten Epping accommodates Mazda’s national parts and distribution centre and has seen Mazda’s warehousing footprint almost double, featuring full air conditioning throughout, and a unique transparent cantilevered façade to Cooper Street, as well as a full warehouse and office fit-out, including racking.

Property snapshot

Property size

Site 60,630 sqm

Warehouse size 36,600 sqm

Warehouse office size 121 sqm

Driver's amenities size 8 sqm

Main office size 899 sqm

Carpark spaces 160

 

Completed

April 2020

250m

Hume Freeway access  

32km

to Melbourne CBD

20km 

to Melbourne Airport

6 recessed

 loading docks

6 at-grade 

roller shutter doors

160

car park spaces

5 Star

Green Star Design certified rating

Water saving

tapware (minimum 5 WELS rating)  

Rainwater

capture and re-use  

Making Momentum

We have partnered with Mazda Australia Pty Ltd for more than 15 years now. Hear from Amanda Darmanin and Martin McAlinden as they speak about their new state-of-the-art 37,235 sqm National Parts Distribution Centre at our Premium Estate, 4Ten Epping in Victoria.

Location

Positioned to perform

Connectivity is key. Mazda Australia's 4Ten Epping's location delivers fast, direct and unbeatable access in all directions.

Strategic access
Airport
Sport + health
Eat + drink
Transport
Open in Google Maps

Features

 

 

Alt Text

Sustainability

 

 

  • 5 Star Green Star Design certified rating from the Green Building Council of Australia
  • Rainwater capture and re-use
  • Energy efficient sensor lighting to office and warehouse areas
  • Water saving tapware (min 5 WELS rating)
  • Native plants and drip irrigated landscaping
  • Dedicated green walls and landscaped outdoor area
  • Energy and water metering and monitoring
  • Improved indoor environment with low VOC paints, carpet and sealants
  • 900kW rooftop solar PV installation
  • Powered by 100% carbon neutral energy
frasers

Learn more about 4Ten Epping

News

18.11.24

Solar power installation begins at The Tube, Germany

Together with Sunrock, we are excited to announce the installation of a 6.7 MWp solar power system at The Tube in Düsseldorf, Germany.

13.11.24

Frasers Property Industrial introduces new video series

In a new video series we ask our most influential thinkers how they see the future of industrial property evolving over the next century.

12.11.24

Frasers Property Limited reports FY24 full year results

Frasers Property Limited (FPL) has announced its results for the full year ended 30 September 2024 (“FY24").

06.11.24

Troy Whalan joins industry leaders on panel at PCA Industrial Lunch Queensland

We were thrilled to see Troy Whalan, General Manager – Queensland as part of a panel at the Property Council of Australia’s QLD Industrial Lunch.

31.10.24

efm Logistics opens facility at SC1 Archerfield Queensland

We are pleased to support leading end-to-end supply chain solutions company efm Logistics as it expands its footprint into Queensland with a five-year lease at our SC1 Archerfield Estate.

Contact

Get in touch

Matt Gillett

Matt Gillett

General Manager - Business Development 

Frasers Property Industrial

 

matt.gillett@frasersproperty.com.au

Office +61 3 9426 1057

Mobile +61 418 523 930

Dom Meese

Dom Meese

Development Manager

Frasers Property Industrial

 

dom.meese@frasersproperty.com.au

Office +61 3 9426 1036

Mobile +61 419 012 641

Follow us

Stay informed on our social media channels

Recommended

frasers

New development

4Ten Epping

The Tube

Download the app

Healthy Heads in
Trucks & Sheds